The Bridge Machine – Regenerative Lightweight Rivercity
What happened to the East London after the second barrier constructed in 2030?
An urban time framed infrastructure will generate new city feedback mechanism between waste management, schematic urban activities and visual experiences along the river. It is to bring a lighter, quicker and profitable river city away the single centre cored London.
- Waste management machine – Visual Feedback
- Plastic Concrete Production – Materials Feedback
- Large Periodic Spaces linking North South – City Feedback
www.tommyhuihk.com